At Phoenixinfrastuctures, we specialise in Horizontal Directional Drilling and cable laying. And we provide a range of services to including EPCM( Engineering, procurement and construction management) to the Oil&Gas industry, Water and Sewage projects, Telecom industry and. We use trenchless technology to take care of HDD projects in different fields like power and telecom industry.

About Us

We Specialize in the below Services

  • OFC LAYING MANUEL TRENCHING
  • OFC JOINTING (SPLICING)
  • CHAMBER INSTALING
  • BUILT MOBILE TOWER OFC CABLE PULLING(BLOWING)
HTB12Sn4OXXXXXcCXVXXq6xXFXXXG

Our Services

1

OFC laying by manual trenching

We have a specialized team of experts to execute the laying of optical fibre cable laying for the telecom industry by manual trenching. 
Some of the projects we are proud of include:
Laying power cable for the Kerala State Electricity Board 
11 kV CABLE LAYING IN HDD METHOD AND MANUEL TRENCHING 
66 kV CABLE LAYING IN HDD METHOD AND MANUEL TRENCHING 
11 kV AND 66 kV CABLE JOINTING.  
2

Splicing and Blowing OFC

We use state of the art equipment and procedures, to provide splicing and blowing of fibre-optic cable by our experienced team. So far we have executed over 5000+ kilometres of laying of Optical Fiber Networks by Horizontal Directional Drilling technology including all associated allied activities such as blowing and splicing in locations across India for Kerala State Electricity Board,  AIRTEL, RAILTEL, and Network for Spectrum optic fibre cable laying for BSNL.
3

HDD PROJECTS

Horizontal Directional Drilling is a minimum impact, trenchless method for installing underground utilities. At Phoenix infrastructure, we specialise in the techniques used for this modern, less hassle method of utility installation. We have executed 150+ kilometres of pipeline laying using the HDD method across various rivers and water bodies for large diameters and long lengths in all terrains including soil to hard rock. 
4 INCH TO 24 INCH iron pipe HDD pipe laid for Kerala water authority.
4 INCH TO 20 INCH LAYED across various locations in Kerala.
4

PIPE PUSHING PROJECTS

Pipe pushing, another low impact utility installation technique is instrumental in executing projects in already urbanised areas. We have executed the pipe pushing project at Palakkad railway crossing and National Highways.
Executed5000+ Kilometers

MajorSuccess stories

  • 11 KV cable laying in the HDD method with manual trenching.
  •  66 KV cable laying in HDD method with manual trenching.
  • Manual trenching 11 KV and 66 KV cable trenching.
  • OFC blowing and splicing for LAN INDIA, KSEB,AIRTEL, RAILTEL, NFSofc for BSNL
  • 4 INCH TO 24 INCH HDD pipe laid for Kerala water authority
  • Iron pipe 4 INCH TO 20 INCH laid for various places in Kerala.
Copyright © Phoenix Infrastructures 2019 — All rights reserved.